What to send for an accurate telecom equipment quotation
Send six fields: the orderable part number with its revision or BOM code, the condition grade and firmware load you will accept, the ship-to country and Incoterms rule, the quantity with any delivery split, the documents your broker needs, and the end use. Each field removes an assumption the supplier would otherwise price.
What makes an inquiry quotable at all?
A supplier prices a configuration, and the inquiry supplies it. Leave out the revision and the cheapest build that matches the part number gets quoted. Leave out the Incoterm and freight, insurance and duty sit outside the number.
The quote returns fast and low, and the purchase order confirms higher. The difference is usually a field that was missing from the inquiry.
Part number granularity and BOM lines
A Huawei board carries a silkscreen name, an eight-character BOM code and a version field; the electronic label read with display elabel returns all three plus the serial. Cisco identifies a product by PID, and a trailing “=” marks the spare, which ships without the licence and media the production PID carries. Juniper returns part number and serial from show chassis hardware.
A catalogue entry such as the Huawei TN54THA-002 line card is an orderable item, the level a quote needs. “OSN 8800” is a platform, and one shelf spans a subrack, control board, fan trays and cards at several line rates. Two suppliers quoting that line will price two different configurations.
| What the RFQ line says | Real example | What can be priced | What stays unknown |
|---|---|---|---|
| Product family | OSN 8800 | Nothing firm | Shelf, card, line rate, revision, options |
| Orderable part number | TN54THA-002 | One board at one rate | Hardware revision, firmware, accessories |
| Part number plus revision | Label “Ver.” field | The exact build | Licence state, date code |
| Part number plus spare flag | Cisco PID, with or without “=” | Spare or licensed unit | Licence transfer path |
The same PID ships in several hardware revisions, and a pluggable cage, backplane connector or fan tray can accept one and reject another. Transceiver compatibility also depends on the host software release, so the shelf load belongs next to the part number.
Accessory lines fall off BOMs because they look like infrastructure. A shelf without a fan tray, power filter, control board and matching licence does not reach commissioning, and the missing items return as change orders at list price.
Sourcing runs on part numbers. A stock list is searchable by PN, and a family name returns nothing, so the supplier asks a question or prices the cheapest item.
Condition grades, firmware and licence state
Two cards can both be called refurbished while one has run 24 hours at line rate in a thermal chamber and the other only powered on. Test labour, burn-in time and the warranty follow from that difference, and the invoice pays for all three.
| Grade written on the RFQ | Definition | Evidence to attach | What the price covers |
|---|---|---|---|
| New sealed | OEM packaging unopened, date code stated | Label and date code photo | OEM warranty route, no test labour |
| New surplus | Never deployed, packaging opened | Firmware read-back, no insertion marks | Supplier warranty, incoming test |
| Refurbished, tested | Pulled, cleaned, tested to a named standard | Test report with limits and instrument serials | Test labour, warranty, RMA |
| Used, as-is | Pulled, power-on only | None | Unit only, buyer carries test |
A replacement card also has to run a load the shelf accepts: Huawei OSN shelves match board software to the host version; Cisco routers expect a named release. A card two major releases behind needs an upgrade window.
A licence attaches to a serial number or a chassis, so a used unit can cost more than a new one when the licence does not travel with the card. A 100G port licence or an OTN cross-connect licence may or may not move with the hardware. On some platforms it sits on the chassis; on others it is fixed to the original serial. Name the features to be enabled and ask whether the licence is included, transferable or chargeable at re-host.
The A2h page defined by SFF-8472 reports temperature, supply voltage, bias current and both power monitors, so a used module can be read against a commissioning baseline. Bias current against that record shows laser wear; temperature history shows whether the module lived in a hot enclosure.
A used radio unit needs a bench that the datasheet will not describe. The Huawei RRU5904, for example, is an 1800 MHz remote radio head rated 4x60W from a -48V DC feed, and a credible test report measures RF output and receive sensitivity against 3GPP TS 38.104 rather than confirming that the unit powers on.
A 90-day return-to-base warranty and a 12-month advance-replacement warranty are different products, and the second costs the supplier real money. Name the remedy, who pays freight both ways, and when the clock starts. The refurbished equipment inspection checklist lists the test records to ask for.
Landed cost, documents and export control
A shipment from Shenzhen carries a freight bill, an insurance premium and an import duty assessment, and the Incoterms rule assigns each one. Of the 11 Incoterms 2020 rules, FCA, CIP and DDP decide most quotes.
| Incoterms 2020 rule | Seller pays | Buyer pays | Fits which shipment |
|---|---|---|---|
| EXW | Packing only | Pickup, export, freight, import | Buyer has a forwarder in Shenzhen |
| FCA | Export clearance, delivery to carrier | Main carriage, insurance, import | Containers, per ICC guidance |
| FOB | Export clearance, loading on vessel | Ocean freight, insurance, import | Break-bulk and ro-ro cargo |
| CIF | Ocean freight, ICC (C) cover | Import duty, onward carriage | Low-value spares by sea |
| CIP | Carriage, ICC (A) cover | Import duty | High-value electronics |
| DAP | Delivery to the named place | Import clearance and duty | Buyer has a customs broker |
| DDP | Everything, including import duty | Nothing further | Seller has an import registration |
FOB puts the seller’s obligation at the point the goods are on board, and a container is handed to the terminal days before it reaches the ship. The seller’s risk ends in the yard, which is why the ICC recommends FCA for containers. CIP now requires Institute Cargo Clauses (A) cover; CIF keeps the (C) minimum. DDP needs an importer of record in the destination country, without which the shipment stops at customs.
Customs acts on the commercial invoice code. A line card can be declared under 8517.62 as transmission apparatus or under 8517.70 as parts, and the duty rate differs by market. Have your broker confirm the code before the PO.
| Item on the invoice | HS 2022 heading | Why the broker asks |
|---|---|---|
| Switches, routers, baseband, transmission apparatus | 8517.62 | Duty rate and import licence check |
| Boards and parts of that apparatus | 8517.70 | Parts classification, different duty |
| Optical fibre cable | 8544.70 | Separate commodity line |
| Lithium-ion battery packs | 8507.60 | UN 38.3 test summary and carrier approval |
Export control adds a second classification on top of the tariff code. Telecom equipment that does not meet the 5A001 thresholds commonly falls under ECCN 5A991 or EAR99, and an encryption function can move an item into the 5A002 or 5A992 family. China’s dual-use regime has applied since 1 December 2024, and listed items need a licence before export.
Lithium batteries travel under UN 38.3 test evidence and the IATA packing instructions 965 to 967, depending on whether the cells ship alone, packed with equipment or fitted inside it. A quote that ignores the battery line gets a carrier rejection at the airport. Solid-wood packing needs the ISPM 15 mark, heat-treated at 56°C for 30 minutes or fumigated with methyl bromide; plywood and OSB are exempt.
How do quantity and delivery staging change the number?
A request for 100 units of one part number can draw on six sellers with six date codes, because used stock is held in lots. Matching those lots for a customer-facing cabinet costs inspection time.
| Quantity band | How the supplier sources it | What moves in the price |
|---|---|---|
| 1 to 4 | Broker stock, single lot | Unit price, air freight dominates |
| 5 to 20 | One consolidated lot | Test cost spread over more units |
| 21 to 100 | Several lots, matched date codes | Inspection and cosmetic grading |
| Over 100 | Project quote, staged release | Allocation risk, buffer stock |
Ask for the unit price at 1, 10, 50 and 100 pieces in one request. On new equipment the curve is steep because manufacturing cost falls with batch size; on refurbished equipment it flattens quickly, because sourcing and test dominate and the stock does not multiply.
Each consignment needs its own export declaration, certificate of origin and pre-shipment inspection; less-than-container loads usually carry a 1 CBM minimum charge, and airfreight carries a minimum charge per airway bill.
A BOM with a few long-lead lines forces the staging decision. A 40-line order where three cards need eight weeks can ship 37 lines now and 3 later, or hold the whole project. Ask the supplier to quote both, with a ship-complete date for each.
For end-of-life cards, ask how many units the supplier physically holds and whether they will reserve stock against a PO date. Ten units of a falling-availability part can be gone in a week, so ask for the reservation in writing.
What does a filled RFQ look like?
A spreadsheet with one row per part number and these fields as columns survives forwarding and can be priced line by line.
| Field | Example entry | Why the supplier needs it |
|---|---|---|
| Part number | TN54THA-002 | Resolves to one orderable item |
| Revision or BOM code | 8-digit code from the label | Excludes incompatible builds |
| Quantity | 12 | Sets the sourcing band |
| Condition | Refurbished, tested | Sets test scope and warranty |
| Firmware | Current shelf release, stated | Confirms shelf compatibility |
| Ship to | Lagos, Nigeria | Freight and duty calculation |
| Incoterm | CIP | Names who pays which leg |
| Documents | Form E, test report, packing list | Customs and acceptance |
| Partial shipment | Allowed or not allowed | Staging premium |
| End use | Metro transport expansion | Export control screening |
| Currency and validity | USD, 30 days | Makes two quotes comparable |
| Payment terms | 30% T/T, 70% before shipment | Cost of credit |
The equipment catalogue lists part numbers and condition for each unit, the level of detail a quote should return. A catalogue entry gives a model and a price range, and a quote line resolves to a configuration.
Two fields get left off more than the rest. End use decides the ECCN, and currency plus validity decide whether two quotes can be compared. A CNY price held for 7 days and a USD price held for 30 need conversion to one currency, with both expiry dates recorded.
How do you identify a part when the label is gone?
A missing label costs days. The label is the only place where the BOM code, serial and version sit together.
Huawei gear answers display elabel, returning board name, BOM code, serial and manufacturing date per slot. Cisco gear answers show inventory, printing PID, VID and serial. Juniper gear answers show chassis hardware, with part number and serial per component.
An optical module carries its own identity in the A0h page defined by SFF-8472. Bytes 20 to 35 hold the vendor name, 40 to 55 the vendor part number, 68 to 83 the serial number and 84 to 91 the date code. A module with a destroyed label can still be read from the host, and the part number it reports is the one to quote. QSFP and QSFP-DD modules expose the same fields through SFF-8636 or OIF-CMIS.
A switch with no label can be narrowed by its MAC address. The first three octets are the OUI that the IEEE registers to a manufacturer, and a lookup returns the vendor; the model still needs a port count.
Photos should cover the label square-on, the board silkscreen, the connector end faces and the slot number in the subrack. Four photos answer most of the supplier’s questions, and a microscope image of the end face can be graded against IEC 61300-3-35. The guide to verifying a transceiver’s identity covers the label and memory checks in more detail.
When the part is unknown, send the shelf model, the slot and the service it carries; a supplier who stocks the platform can propose a card by function and return an exact part number for confirmation.
Which substitutions can be quoted, and on what evidence?
The word “compatible” hides two claims. One is a module that meets the same optical standard; the other is a module the host will accept without complaint. Both need evidence, and they come from different documents.
The interface defines optical interoperability. A 100GBASE-LR4 module has to meet the IEEE 802.3ba lane plan and the 10 km reach; a 10GBASE-ER module has to meet the 40 km budget under IEEE 802.3ae. On top of that, many platforms check a vendor code in the module’s memory before bringing the port up. Cisco exposes service unsupported-transceiver to override the check and logs a warning when it is used; other platforms keep the port down.
Ask for a written statement naming the host model, the software release and the port, plus test evidence from that host. A matrix that lists “Cisco” as a family says nothing about a specific card. The 100G QSFP28 product family organises modules by interface and reach, the level at which a cross-reference can be checked.
A newer board revision may need a shelf software upgrade, a different NMS model library and a licence the old board did not require. A supplier can quote the newer board at a lower price and leave those three costs with the buyer.
Put the policy in the RFQ. Say whether substitutes are allowed, and on what basis. An exact-part-only line narrows the stock pool and raises the unit price; an open line widens the pool and lowers the price, with compatibility risk moving to the buyer.
On an unprotected metro link, a coded compatible module with a host-specific statement is a rational purchase. On a protected backbone under an OEM support contract, the entitlement is part of the price, and a third-party module can void it.
How long does a complete RFQ take to answer?
A complete RFQ goes to a stock check the same day; an incomplete one starts an email thread that advances one question per day.
Shenzhen runs UTC+8, so a request sent at 16:00 in New York on Friday arrives at 05:00 on Saturday and gets its first working answer on Monday.
Ask the supplier to write three dates into the quote. Stock check date, lead time for anything not in stock, and price expiry decide whether the offer can be executed.
Six missing revisions on a 40-line BOM means six queries, and the same answers would have cost an hour of preparation with the first email.
The support page covers warranty, shipping and the inquiry channels.
What do buyers ask before a purchase order?
What is the minimum information for a usable quotation?
Part number, quantity, destination country and condition grade. Four fields let a supplier check stock and calculate freight. Everything else sharpens the number. Revision and firmware decide compatibility, the Incoterm decides who pays each leg, and the document list decides whether customs releases the goods.
Can a supplier quote from a photo of the label?
Yes, when the label is legible and carries the part number, BOM code, serial and date code. On Huawei boards the electronic label read with display elabel is more reliable than the sticker. On optics, the A0h page defined by SFF-8472 returns vendor name, part number, serial and date code even after the label is gone.
Does the condition grade change the warranty?
It changes what the warranty can cover. A tested refurbished unit has a test record that defines a baseline, so the supplier can offer a replacement term against it. An as-is unit has no baseline, and the warranty usually shrinks to a dead-on-arrival window. Ask for the remedy, the freight responsibility and the clock start in writing.
Should the RFQ allow alternatives?
Only with a stated basis. An alternative needs a written compatibility statement naming host model, software release and port, plus test evidence on that host. Without those documents the alternative moves compatibility risk to the buyer, and the price difference is payment for that risk.
Which Incoterm fits a first order from Shenzhen?
FCA for containers, because the ICC recommends it over FOB for containerised cargo. The seller clears export and hands the box to the carrier. DAP suits a buyer with a customs broker. DDP works only when the seller has an importer of record in the destination country.
Sources
- Incoterms 2020, International Chamber of Commerce: rules EXW, FCA, FOB, CIF, CIP, DAP, DDP; ICC guidance on FCA for containerised cargo; CIP cover under Institute Cargo Clauses (A).
- World Customs Organization, Harmonized System 2022, headings 8517.62, 8517.70, 8544.70 and 8507.60.
- UN Manual of Tests and Criteria, Part III, subsection 38.3; IATA Dangerous Goods Regulations, packing instructions 965 to 967; ISPM 15 for solid-wood packaging.
- IEEE 802.3ba and IEEE 802.3ae: 100GBASE-LR4 at 10 km, 10GBASE-ER at 40 km.
- 3GPP TS 38.104, NR base station radio transmission and reception.
- SFF-8472: A0h bytes 20-35 vendor name, 40-55 part number, 68-83 serial, 84-91 date code; SFF-8636 and OIF-CMIS for QSFP management.
- IEC 61300-3-35, visual inspection and end-face zone criteria for fibre-optic connectors.
- Export Control Law of the People’s Republic of China and the dual-use regulations effective 1 December 2024.
Need a specific part?
Send the part number and quantity — we confirm condition, availability and price before you commit.